§ 11-4. Evaluation, inspection, and issuance.
(a) Evaluation.
The Director of Public Works will evaluate the data furnished by the waste hauler and may require additional information.
(b) Inspection.
After evaluation and acceptance of the data furnished, an inspection of the equipment to be used for transport of the wastewater and an inspection of the facilities where the wastewater is generated may be required.
(c) Issuance.
The Director may then issue a waste hauler permit subject to terms and conditions provided herein.