§ 26-4. Inspection reports.
(a) Reports required.
Written reports must be made of all inspections conducted during construction.
(b) Scope.
Each inspection report must specify:
(1) the date and location of the inspection;
(2) whether the construction complies with the approved stormwater management plan;
(3) any variations from the approved construction specifications;
(4) any violations found; and
(5) any other information that the Department requires.
(c) Notice to applicant.
The Department must provide the applicant with the results of each inspection report as soon as possible after the inspection.