City of Baltimore
Baltimore City Code

Section 105. Approval

105.1 Modifications. {As in IFGC}

105.2 Alternative materials and methods.

The provisions of this Code are not intended to prevent the installation of any material or to prohibit any method of construction not specifically prescribed by this Code, as long as that alternative has been approved. An alternative material or method of construction may be approved if the Code Official finds in writing that, for the purpose intended:

1. the proposed alternative is satisfactory and complies with the intent of this Code, and

2. the material, method, or work offered is at least the equivalent of that prescribed in this Code in quality, strength, effectiveness, fire resistance, durability, and safety.

105.2.1 Research reports. {As in IFGC}

105.3 to 105.5 {As in IFGC}