City of Baltimore
Baltimore City Code

Section 1206. Piping Installation

1206.1 to 1206.8 {As in IMC}

1206.9 Strains and stresses {As in IMC}

1206.9.1 Flood hazard areas.

Piping located in a flood hazard area must be capable of resisting hydrostatic and hydrodynamic loads and stresses, including the effects of buoyancy, as required by the Floodplain Management Code..