Section 1101.6. Construction and Plans for Operation
1101.6.1 IAQ Construction Management – flushout OR IAQ monitoring.
See 1001.3.1.5(b) (1 Point) .
Exception: This option does not apply to preK-12 schools or healthcare projects.
1101.6.2 Envelope Airtightness.
See ICC version of § 1001.3.1.3.5 {"Building Envelope Airtightness"} (1 Point).
1101.6.3 High-Performance Building Operation Plan – Site Sustainability.
See ICC version of § 1001.3.2.1.1 {"Site Sustainability"} (1 Point).
1101.6.4 High-Performance Building Operation Plan – IAQ.
See ICC version of § 1001.3.2.1.4 (1 Point).
1101.6.5 High-Performance Building Operation Plan – Green Cleaning Plan.
See ICC version of § 1001.3.2.1.4.5 {"Building Green Cleaning Plan"}. (1 Point).
1101.6.6 High-Performance Building Operation Plan – Moisture Measurement.
See ICC version of § 1001.3.2.1.4.6 {"Moisture Measurement". (1 Point).
1101.6.7 High-Performance Building Operation Plan – Indoor Environmental Quality Survey.
See ICC version of § 1001.3.2.1.5 {"Indoor Environmental Quality Survey"} (1 Point).
1101.6.8 High-Performance Building Operation Plan – Maintenance Plan.
See ICC version of § 1001.3.2.2 {"Maintenance Plan"} (1 Point).
1101.6.9 High-Performance Building Operation Plan – Service Life Plan.
See ICC version of § 1001.3.2.3 {"Service Life Plan"} (1 Point).
1101.6.10 High-Performance Building Operation Plan – Transportation Management Plan.
See ICC version of § 1001.3.2.4 {"Transportation Management Plan"} (1 Point).