§ 8-120. Required CEMS reports.
(a) Reports required.
(1) Each facility must provide a daily report to its Air Monitoring Contractor that details:
(i) the daily emissions from the facility of the pollutants listed in § 8-114 {"Pollutants to be continuously monitored"} of this Part II; and
(ii) the reasons for any CEMS downtime.
(2) All data supplied as part of the reports required by this section are property of the City of Baltimore.
(b) Form of report.
The daily report required by this section must be in the form specified by the Health Commissioner and include all relevant machine readable raw data.
(c) Reasonable access required.
A facility must provide reasonable access to its property and operations to the Air Monitoring Contractor responsible for preparing the reports required by this section to enable the reports to be prepared and verified.
(d) Historical reports.
Each facility must provide its Air Monitoring Contractor with all emissions reports for the facility previously provided to the Maryland Department of the Environment, and any prior Air Monitoring Contractor for the facility, at the time that the Air Monitoring Contractor begins monitoring the facility.