City of Baltimore
Baltimore City Code

§ 22-8. Preparation of plan.

(a) In general.

The design of all stormwater management plans must be prepared by a professional engineer, professional land surveyor, or landscape architect licensed in the State.

(b) Professional engineer only.

If stormwater best management practices require a dam safety permit from the Maryland Department of the Environment or small pond approval from the City, the plan must be prepared by a professional engineer licensed in the State.