§ 3-27. Map revision.
Any development in the floodway that proposes to increase the water surface elevation or change the delineation of the floodway requires a Conditional Letter of Map Revision and a Letter of Map Revision as described in § 3-21 {"Letter of map change"} of this subtitle.